Caution | Mandatory Outdoor Water Restrictions

Due to continued dry conditions, mandatory Stage 1 Outdoor Water Restrictions are in place until further notice.

Visit Calgary.ca/restrictions for more information.

Building permit fee calculator - Commercial

Building permit fee calculator for alterations and new commercial projects​

Step 1: calculate base permit fee

Fee type
Rate
Total
Permit Rate
$
× $ 10.14 per 1000 =
$ N/A if PMV is $1000 or less.
Minimum Processing Fee
+ $ 112.00 =
$
BASE PERMIT FEE
$

Step 2: add additional fees and surcharges

Fee type
Rate
Total
Safety Codes Council Fee - Base Permit
$
Base permit fee
× 4 % =
$ Minimum 4.50
Maximum 560.00
Partial permit rate optional
× $ 1.44 =
$ Minimum 112.00
Maximum 4420.00
Safety Codes Council Fee - partial permit (added if partial permit rate is requested)
$
Partial permit rate
× 4% =
$ Minimum 4.50
Maximum 560.00
Lot Grading Fee - Commercial/Industrial (required on all new buildings)
× $ 80.00 =
$
TOTAL PERMIT FEE
$
​​ ​​​​​​

Notes

Authority: this form summarizes the fees collected with Building Permits and should be used for convenience only. For official fees, reference the Calgary Building Permit Bylaw 64M94.

Covered areas: any side or rear covered areas over 10 m2 should be listed under "Living area".

New multi-family buildings: use the Building Permit Fee Calculatior - Low Rise​ for new low-rise wood-frame townhouses and apartments, and the Building Permit Fee Calculatior - High Rise for new high-rise non-combustible apartments that are primarily residential in use. For alterations to multi-family buildings, use this form.

Lot Grading Fees Authority: this form summarizes the fees collected with Building Permits and should be used for convenience only.For official fees, reference the Calgary Bylaw 32M2004 regulating the Surface Grades of Properties. The intent of the bylaw is to ensure that surface drainage flows away from buildings. The Lot Grading Fee is applied to all Building Permit applications for New Commercial / Industrial buildings. The Lot Grading Fee is applied to Commercial / Industrial Additions if grades are required on the Mechanical Site Circulation Slip.

Safety Codes Council fees: for the purpose of the Safety Codes Council fee, the base permit and the partial permit, if requested, are considered two separate items. The municipality will collect the Safety Codes Council fee for each permit, base permit and partial permit, issued under the authority of the Safety Codes Act.

​​​

Prevailing market value - Incl​udes the following items

She​ll

  • Sub-structure (Foundations, Excavation, Special Conditions)
  • Structure (lowest floor, upper floors and roof construction)
  • Exterior Enclosure (walls below grade, walls above grade, Windows and Entrances, Roof Covering, Projections)

Int​eriors

  • Partitions and Doors
  • Finishes
  • Fittings and Equipment (Fitting and Fixtures, Equipment, Elevators)

Serv​ices

  • Mechanical  (Plumbing and Drainage, Fire Protection, HVAC including Controls)
  • Electrical (Service and Distribution, Lighting Devices and Heating, Systems and Ancillary)

General Requ​irem​ents, Profit and Allowances

  • General Site Requirements (site supervision,  temporary site offices and toilets, garbage removal, temporary water and power, temporary site access roads, utility maintenance during construction, winter heat/protection, site safety and security, general constractor’s liabililty insurance, bonding)
  • General Contractor’s Profit
  • Allowances
  • Design and Pricing Allowance ( a contingency to allow for design flexibility during contract document stage) 
  • Construction Allowance (allows for changes during construction – change orders)

Prevailing market value  - Exc​ludes the following items

  • Land Acquisition costs 
  • Development charges
  • Legal Fees and expenses
  • Right of Way charges
  • Easement costs
  • Financing costs or Fundraising costs
  • Owners staff and management cost ( note - contractor cost and staff ARE to be included in prevailing market value​)
  • Relocation costs
  • Professional Design fees and expenses
  • Hazardous waste removal
  • Kitchen equipment except for restaurants/food service establishments
  • Maintenance equipment
  • Loose furniture, furnishings and equipment
  • Special audio, visual or security equipment
  • Window treatments
  • Site Development and Servicing costs
  • Market allowance for uncompetitive bidding & over competitive bidding
  • Escalation allowance
  • GST
​​​​​​​​​​​​​​​​​​​​​​​​​​​​
​​​​​​

Planning Services Centre

Hours:
Monday - Friday
8 a.m. - 4:15 p.m. (MT)

Live chat:
calgary.ca/livechat

Call:
403-268-5311

In person: 
Planning Services Centre,
3rd floor, Municipal building 
800 Macleod Trail SE

Book an eAppointment for in person services at appointment.calgary.ca


This information has no legal status and cannot be used as an official interpretation of the various bylaws, codes and regulations currently in effect. The City of Calgary accepts no responsibility to persons relying solely on this information. Web pages are updated periodically. ​